You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
Version 1
Current »
Name: | field_capacity | Abbreviation: | cap | Unit: | kg m-3 |
Definition | Soil water content 2 days after saturation. |
Validity | instantaneous |
Comment | It is an auxiliary field which should be supplied with the field Soil Moisture. It should be archived for Control Forecast at all forecast-time steps. |
GRIB 2 | Discipline | = 2 | | | Parameter Category | = 3 | | | Parameter Number | = 12 | | | Type of first fixed surface | = 106 | Type of second fixed surface | = 106 | Scale factor of first fixed surface | = 0 | Scale factor of second fixed surface | = 1 | Scaled value of first fixed surface | = 0 | Scaled value of second fixed surface | = 2 |
|
GRIB 2 and C-code for: Control forecast |