Description of the upgrade
Implemented: 01 December 2013
Datasets affected
- TC track
ECMWF's TC track products contain
- time
- position (latitude/longitude in degrees)
- central pressure (hPa)
- location and intensity of maximum wind speed (m/s) for each tropical cyclone identified and tracked in the forecast.
ECMWF's TC track are produced only for tropical cyclones where an observation report is present at the analysis time.
Resolution
Unchanged
Horizontal | Vertical |
---|---|
Horizontal (unchanged)
| Vertical (unchanged)
|
Technical content
- The enhanced TC tracks are coded in BUFR-4 and replace the current BUFR-3 products
- BUFR Section 1 changes:
- edition number changes from 3 to 4;
- length of section 1 changes from 18 bytes to 22 bytes.
- Some steps are coded as missing values in the new product.
- BUFR tables version 16 (files B0000000000000016000.TXT,D0000000000000016000.TXT and C0000000000000016000.TXT). are needed to successfully decode the new TC track products. Users that do not have these tables download the latest version of ECMWF's BUFRDC
- BUFR Section 1 changes:
- The BUFR templates remain unchanged but missing value indicators are used to describe unavailable data entries
- For compatibility reasons, TC track products archived in MARS will continue to be encoded in BUFR-3 but will include all enhancements described above.
Model ID and experiment number
- Atmospheric: 130
- Ocean wave: 116
- Limited-area ocean wave: 216
E-suite experiment number = 0059
Resources
ECMWF Newsletter: See Newsletter No.130.
Contents of this page
All IFS cycles
- Terminology for IFS testing
- Implementation of IFS Cycle 48r1
- Implementation of IFS Cycle 47r3
- Implementation of IFS Cycle 47r2
- Implementation of IFS Cycle 47r1
- Implementation of IFS cycle 46r1
- Implementation of IFS cycle 45r1
- Implementation of Seasonal Forecast SEAS5
- Implementation of IFS cycle 43r3
- Implementation of IFS Cycle 43r1
- Implementation of IFS cycle 41r2
- Introducing the octahedral reduced Gaussian grid
- Horizontal resolution increase
- Boundary-Condition Programme ENS at 06 and 18 UTC
- Implementation of IFS Cycle 41r1
- IFS cycle upgrades pre 2015