Organisation | Data acquisition method * | Data transfer check | Data delay check | Data completeness check | Data quality check |
---|---|---|---|---|---|
CMA (babj) | ftp | YES | |||
CPTEC (sbsj) | http | ||||
ECCC (cwao) | sftp (ssh key) | ||||
ECMWF (ecmf) | MARS retrieval | ||||
JMA (rjtd) | http (wget) | ||||
KMA (rksl) | ecpds (push, dedicated line) | ||||
MF (lfpw) | ecpds (push, dedicated line) | ||||
UKMO (egrr) | ecpds (push, dedicated line) | ||||
NCEP (kwbc) | ftp | ||||
NCMRWF (dems) | ftp |
- Data acquisition method: Acquisition method is pull from the provider's location to ECMWF's premises if not specified
- Data transfer check: Is the data transfer checked to avoid any technical issues on the way from provider's location to ECMWF's premises?
- Data delay check: Is the data availability potential delay checked on the provider's side?
- Data completeness check: Is the data content (number of expected fields; reference field list etc) checked on the provider's side?
- Data quality check: Is there any data quality control to avoid e.g. unrealistic parameter values due to interpolation or any other kind of error either scientific or technical?