Implemented: 10 March 2009
Datasets affected
- HRES
- ENS
Resolution
Unchanged
Horizontal | Vertical |
---|---|
Atmospheric (unchanged)
Wave (unchanged)
| Atmospheric (unchanged)
|
Meteorological content
- Revised snow scheme including a diagnostic liquid water storage and a new density formulation
- Revised ozone chemistry
- Active assimilation of IASI humidity channels and consistent use of AIRS and IASI humidity channels.
- Activate all-sky 4D-VAR assimilation of microwave imagers
- Increase of the weight to GPS radio occultation data above 26 km, and use of the data up to 50 km
- Various satellite-related modifications, including activation of version 9 of the radiative transfer software package RTTOV-9 (developed by NWP-SAF) and revised HIRS cloud detection
- TL/AD longwave radiation (removal of the neural network), optimization of the non-linear code for simplified longwave radiation and optimization (NL, TL, AD) of the shortwave radiation scheme
- Extend the domain of the wave model from 81 º to 90 º North
- Use of ERA-interim analyses for the EFI reforecasts
Meteorological impact
Overall the new cycle is neutral in terms of verification scores for both hemispheres and the tropics.
- Improvements to 2m temperature bias and slightly better performance for recent tropical cyclones in both position and intensity.
- Synoptic performance is generally similar to current operations.
- Impact on EFI from the change to using ERA-interim analyses for its reforecasts is not substantial.
Technical content
Model ID and experiment number
- Atmospheric: 134
- Ocean wave: 119
- Limited-area ocean wave: 219
E-suite experiment number = 0042
Resources
ECMWF Newsletter: See Newsletter 121
Contents of this page
All IFS cycles
- Terminology for IFS testing
- Implementation of IFS Cycle 48r1
- Implementation of IFS Cycle 47r3
- Implementation of IFS Cycle 47r2
- Implementation of IFS Cycle 47r1
- Implementation of IFS cycle 46r1
- Implementation of IFS cycle 45r1
- Implementation of Seasonal Forecast SEAS5
- Implementation of IFS cycle 43r3
- Implementation of IFS Cycle 43r1
- Implementation of IFS cycle 41r2
- Introducing the octahedral reduced Gaussian grid
- Horizontal resolution increase
- Boundary-Condition Programme ENS at 06 and 18 UTC
- Implementation of IFS Cycle 41r1
- IFS cycle upgrades pre 2015