Status:Ongoing analysis Material from: Linus
Discussed in the following Daily reports:
http://intra.ecmwf.int/daily/d/dreport/2015/06/22/sc/
http://intra.ecmwf.int/daily/d/dreport/2015/06/23/sc/
http://intra.ecmwf.int/daily/d/dreport/2015/06/24/sc/
http://intra.ecmwf.int/daily/d/dreport/2015/06/25/sc/
http://intra.ecmwf.int/daily/d/dreport/2015/06/26/sc/
http://intra.ecmwf.int/daily/d/dreport/2015/06/29/sc/
http://intra.ecmwf.int/daily/d/dreport/2015/06/29/sc/
http://intra.ecmwf.int/daily/d/dreport/2015/07/01/sc/
Picture
1. Impact
2. Description of the event
The plots below shows the evolution of z500 and t850 and analyses spanning from 26 June to ...
Analysis of z500 and t850
There are no images attached to this page.
3. Predictability
3.1 Data assimilation
3.2 HRES
3.3 ENS
3.4 Monthly forecasts
3.5 Comparison with other centres
4. Experience from general performance/other cases