The 16th WMO Congress (2011) approved a number of significant changes to the standard procedures for verification of deterministic NWP products, as recommended by CBS-Ext.(2010). The updated procedures will make the results more consistent and relevant for current NWP.
LC-DNV coordinates and facilitates the transition to the updated procedures. All GDPFS centres are encouraged to read the information and guidance provided and to implement these changes as soon as possible.
The main changes to the verification procedures are:
It is important that all centres implement these changes to ensure that exchanged scores are as consistent and relevant for current NWP as possible.
Additional changes include:
Details of the verification procedures can be found in Appendix 2.2.34 of Manual on the Global Data-processing and Forecasting System: Annex IV to the WMO Technical Regulations. Implementation details can be found here among the Lead Centre documents (the document in preparation). Centres are recommended to consider these proposals when implementing the new verification procedures.
The procedure to exchange the verification results between centres has changed as well. The previous email exchange has been replaced by an ftp exchange provided by the LC-DNV. The data format for verification reports is changed to a new format coordinated by the LC-DNV.
The status of implementation of updated procedures in participating centres is available in a table maintained by the LC-DNV.