ERA Interim is a dataset, showing the results of a global climate reanalysis from 1979 to date. ERA Interim continues to be updated in near-real-time as new data becomes available.
ERA Interim is one of several products of two research projects, ERA-CLIM and ERA-CLIM2.(to be checked)
Product description
Synoptic monthly averages at 0 UTC, 6 UTC, 12 UTC, 18 UTC
The data assimilation system used to produce ERA-Interim is based on a 2006 release of the Integrated Forecast System (IFS - Cy31r2). The system includes a 4-dimensional variational analysis (4D-Var) with a 12-hour analysis window.
Parameters and download
For a list of fields (parameters) in ERA Interim and for downloading data see the ECMWF dataserver. Note that while ERA-Interim "runs" in near real time, data is published with a few moths delay.
Note that we are aware of several quality issues with ERA-Interim data.
Further documentation
See Berrisford et al. (2011) for detailed documentation of the parameters in this dataset.
An open-access journal article describing the ERA-Interim reanalysis is available from the Quarterly Journal of the Royal Meteorological Society. Additional details of the modelling and data assimilation system used to produce ERA-Interim can be found in the IFS documentation (choose Cy31r1) .
Further detailed documentation on ERA Interim is available in the ECMWF eLibrary.