The first telecon over the S2S weather extreme subproject took place on Monday 29 April 2013. Were present at this meeting:

 

The goal of this meeting was to discuss a first case study of an extreme weather event. It was agreed that the cold March over Europe would a good test case study for the S2S extreme weather subproject.

The following figures show an evolution of 2-metre temperature anomalies and geopotential height at 500 mb averaged over weekly periods over February and March 2013 from the ECMWF reanalysis

March2013.pdf

These figures show that the onset of the event took place in the first week of March. Therefore forecasts starting from mid February would be interesting to analyse for their skill to predict the onset and the persistence of the cold spell over Europe.

 

It was agreed to exchange forecast data between NCEP, EC, JMA, ECMWF and UKMO (to be confirmed by Alberto)

We agreed on the following points: