UNDER CONSTRUCTION
In general it is organised, as a huge tree, with the indentation below, showing different levels down that tree:
- origin and model (eg SHMI, Atmospheric model etc)
- type of data (analysis, forecast, etc)
- year
- month
- type of level (model level, pressure level, surface etc)
- dates, times, steps, levels, parameters (same tape file)
- dates, times, steps, levels, parameters (same tape file)
- type of level (model level, pressure level, surface etc)
- month
- year
- type of data (analysis, forecast, etc)