...
- The Control Forecast must be number 0,
- The number of members is identical to the number of all EPS members plus the Control Forecast.
GRIB encoding
TIGGE GRIB2 checking tool
The so called tigge_check tool is a part of ecCodes package. It should be used to validate all GRIB2 files prepared for TIGGE. The tool is checking all encoding details so that only fully compliant TIGGE files following exactly required definitions would pass. Find more information about the tool in the page Data encoding checking tools
Encoding
...
General GRIB2 key
- gribMasterTablesVersionNumber ie.g <=4
- =17 (current latest one released in 2019)
- =17 (current latest one released in 2019)
- localTablesVersion=0
- no local tables should be used
TIGGE Production status of processed data
Octet 20 of section 1 of a GRIB2 message contains the Production status of processed data. The WMO has added two values to table 1.3 Production status of data:
- 4:TIGGE operational products
- 5: TIGGE test products
...
Ensemble and
...
deterministic forecasts
Control and perturbed forecasts are identified in section 1 and 4. The following tables explains how to code them in GRIB2:
Section 1 | ||||
---|---|---|---|---|
ensemble forecast | deterministic forecast | |||
Octets |
perturbed (pf) |
control (cf) | forecast * (fc) | |||
21 | type of processed data | 4 | 3 | 2 |
(*) high-resolution forecast interpolated to ensemble resolution (new request from 2020 for TIGGE, phase III)
Ensemble (section 4, template 4.61) | ||||
---|---|---|---|---|
ensemble forecast | deterministic forecast | |||
Octets |
perturbed (pf) |
control (cf) | forecast * (fc) | |||
8-9 | product definition template number | 1/11* | 1/11* | 0/8* |
35 | type of ensemble forecast |
3 | 1 |
36 | perturbation number |
<eps number> | 0 | |
37 | number of forecasts in ensemble |
<eps size> |
<eps size> |
- statistically processed (typeOfStatisticalProcessing is set up)
...
Data exchange
The input fields should be split by the output data type, level type and eps number as per below. All steps should be merged into the same file.
Naming convention
tigge_CCCC_YYYYMMDDHH_VVVV_TT_LL_NNN.grib2.grib2 ... for ensemble forecasts
tigge_CCCC_YYYYMMDDHH_VVVV_TT_LL.grib2 ... for high resolution forecasts
- CCC: centre acronym (e.g. kwbc for NCEP data)
- YYYYMMDDHH: date * time stamp (e.g. 2019100100 for 0Z run on 2019-10-01)
- VVVV: test/prod
- TT: cf/pf/fc (output type i.e. control forecast/eps member/high resolution forecast)
- LL LL: pl/sl/pt/pv (pressure or surface datalevel type i.e. pressure/surface/pv level/pt)
- NNN: eps number (cf=0000, eps1=1001,....)