Section | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
OP-I photo will be available
OP-II photo will be available
OP-III photo will be available | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Section | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Column |
Panel |
Case 5
Case 6 Lectures You can download lectures from here:
Column |
Panel |
EUMETCAL e-training module on verification: The link below will take you to an e-training module on verification methods. There are four parts to it: Introduction, Verification of continuous variables, Verification of categorical forecasts and Verification of probability and ensemble forecasts. This module will help you to learn about verification techniques for deterministic and probability forecast. Try to complete all the parts and in case you run out of time look at the Introduction, Verification of categorical forecasts and Verification of probability and ensemble forecasts. There will be a verification session during the training week when verification techniques will be discussed starting from the exercises you have done in the module and your practical verification activity: VERIFICATION METHODS
|
Dealing with 'jumps' in the forecast (Instructor-led practical session)
In this interactive session we will focus on apparent jumps, between runs, in ECMWF forecasts and how forecasters can perhaps deal with them. Examples will be included. The point will also be made that a sound forecasting system has to exhibit 'jumpy behaviour' from time to time.
Case 1
Case 2
Case 3