...
Kick off meeting slides
Reference material available C3S_XXXXX kick off_contract_managementavailable C3S SIS Contract Management.pptx
Communication guides
...
Meeting 3: Cross SIS meeting 3 minutes.pdf
Meeting 4: Seasonal Forecasting Presentation
User guides and documentation:
...
EdgE POC user guides: 2015-C3S_441-LOT1 NERC SC2 D1.2.1 EDgE web user guide v2.pdf (NOTE this document is from the POC phase and includes sections that are not relevant to 422 contracts (specifically market analysis), SIS's based on the toolbox should also include sections on workflows / applications (INPUTS / OUTPUTS etc see example below) and will need to include any tools which were developed within the contract.
C3S 422 Lot 1 Global Shipping web application guidance (DEMO): D422Lot1.OSM.2.11(2) Demo web-application v0.2.docx
...
Training guidance: To follow
Links to technical information
- Data Supplier Guide on confluence: https://confluence.ecmwf.int/display/CST/DSG%3A+Data+supplier+guide
- Guide for Data Delivery and submitting variable names for the CDS / C3S team: Dataset delivery: CDS and Toolbox
- Submitting Data to the CDS: https://confluence.ecmwf.int/display/COPSRV/How+to+integrate+data+in+the+CDS+Catalogue
- Guidance on preparing abstracts for the CDS catalogue Guidelines for content of an abstract on the CDS overview page
- SUBMITTING APPLICATIONS to the catalogue: Public applications on the CDS or download the .docx file Delivering Public applications to the CDS-v9-20190620_111203.docx
- Read the guidance above
- New contracts can use the following template Information_contrcat-tag_ECV-or-SIS-name_Optional-tag_yyyymmdd.docx
- The provider uses the Service Desk ( https://jira.ecmwf.int/servicedesk/customer/portal/5 ) to send the required information, or in the case of new contracts the template in 2. filled in (even before any files were produced, or as soon as possible, in order the CDS may evaluate if the dataset can be integrated).
- The CDS provides feedback in max 2 weeks time on any issues that were detected and which may prevent a smooth integration. A iterative process will start and convergence is to be expected. Otherwise, any blocking issues for the integration and delivery of the dataset through the CDS will be detected at this stage, that is before a lot of effort was put in the production of a dataset that can not be integrated in the CDS.
- Common data model: https://confluence.ecmwf.int/display/CST/CDM%3A+Common+data+model+specification
- How to contribute to the toolbox: https://confluence.ecmwf.int/display/COPSRV/How+to+contribute+to+the+toolbox
Harmonised table template: Harmonized_tables C3S_SIS_EXAMPLE.xlsx
...
- Developed by Predictia to support the migration of the POC demonstrators: Web architecture to develop demonstrators based on the CDS Toolbox (intrim report): C3S 425 technical document.pdf
Presentation of how to deliver Data and Documentation to the CDS (note that this is for reference and written for ECV contractors): RDragani_C3S_X-CDR_20181108.pptx