...
- 4:TIGGE operational products
- 5: TIGGE test products
...
Ensemble and
...
deterministic forecasts
Control and perturbed forecasts are identified in section 1 and 4. The following tables explains how to code them in GRIB2:
Section 1 | ||||
---|---|---|---|---|
ensemble forecast | deterministic forecast | |||
Octets | Example perturbed (pf) | Example controlcontrol (cf) | forecast * (fc) | |
21 | type of processed data | 4 | 3 | 2 |
(*) high-resolution forecast interpolated to ensemble resolution (new request from 2020 for TIGGE, phase III)
Ensemble (section 4, template 4.61) | |||||
---|---|---|---|---|---|
ensemble forecast | deterministic forecast | ||||
Octets | Example perturbed (pf) | Example controlcontrol (cf) | forecast * (fc) | ||
8-9 | product definition template number | 1/11* | 1/11* | 0/8* | |
35 | type of ensemble forecast | 255 (missing) | 3 | 1255 (missing) | |
36 | perturbation number | 7<eps number> | 0 | ||
37 | number of forecasts in ensemble | 51<eps size>51 | <eps size> |
- statistically processed (typeOfStatisticalProcessing is set up)
...