Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

ERA5 and ERA-interim are carried out by two different Integrated Forecast System (IFS) cycles. Therefore, the snowmelt equations used in the HTESSEL parametrisation are different: