...
Control and perturbed forecasts are identified in section 1 and 4. The following tables explains how to code them in GRIB2:
Section 1 | |||
---|---|---|---|
Octets | Example perturbed | Example control | |
21 | typeOfProcessedData | =4 | =3 |
Ensemble (section 4, template 4.61) | |||
---|---|---|---|
Octets | Example perturbed | Example control | |
35 | type of ensemble forecast | = 255 (missing) | = 255 (missing) |
36 | perturbation number | = 7 | = 0 |
37 | number of forecasts in ensemble | = 51 | = 51 |
3) Time component and reforecasts
4) Examples of GRIB2 files
real-time | re-forecast | |
Daily average | Control Perturbed | Control Perturbed |
Accumulations | Control Perturbed | Control Perturbed |
Instantaneous | Control Perturbed | Control Perturbed |
Maximum over the last 6 hours | Control Perturbed | Control Perturbed |
Minimum over the last 6 hours | Control Perturbed | Control Perturbed |
Example of a new ocean parameter